INSTRUCTIONS ON USE
Start applying the plaster no sooner than after surface preparation and once it becomes completely dry. During plaster application and drying, the surface and ambient temperature must be from + 5o C to + 25o C. To decrease the temperature of the walls and avoid too fast drying of the applied plaster, use appropriate protections. It is unacceptable to apply plaster when air humidity is more than 75%, in rainy (drizzle, rain) or very windy weather. The aforementioned conditions ought to be maintained at least for 48 hours following application. After the plaster is applied and before it completely dries, you are recommended to use protective nets or films to protect the plaster against too much sun or rain exposure. In that period, temperature drops below +5o C are unacceptable. Higher air humidity in the autumn and winter extends the drying time. If you fail to observe the aforementioned recommendations or prepare the surface in a wrong manner, the plaster can become discolored and, in extreme cases, become less durable and loosen. As the product contains mineral fillers, it is recommended to apply the material from no more than one production batch on a given surface.
While selecting the color of your plaster, follow the instructions about UV resistance included in color charts. Colors with light reflection coefficient lower than 30% should not be applied all over the surface but merely as decorative elements. It is unacceptable to modify the product’s composition and mix it with products of other manufacturers. The manufacturer shall not be liable for your failure to observe the aforementioned instructions.
NOTE
In case of colored plaster, pay attention to the compliance of your shade with the color chart and to the compliance of shades in all the packages.
CONSUMPTION*
Grain/Consumption
1,0 mm / 1,5-2,2 kg/m²
1,5 mm / 2,4-2,9 kg/m²
2,0 mm / 2,9-3,4 kg/m²
3,0 mm / 3,0-3,5 kg/m²
(*) – final consumption is dependent on the material, evenness and surface absorptiveness and application method.